Facilities
Production facilities
RWI's facilities are designed to support natural and consistent edible bird's nest processing.
Main Facilities
- Land Area
- 1.4 hectares
- Building Area
- 9,500 m²
- Swiftlet Bank 1 & 2
- 2,500 m³ each
- Cold Storage
-
Raw Material
231.2 m²
Export
231.2 m²
- Facility Area
- 3,500 m²
- Office Area
- 730 m²
Facility Standards
Facilities are operated with attention to cleanliness, production area safety, and regular maintenance in line with HACCP and ISO 22000:2018 standards.
- 01 Cleanliness and sanitation of production areas.
- 02 Safety of production and storage areas.
- 03 Regular facility maintenance.
Facility Map
RWI facility layout
The layout below shows the production and support areas within the RWI facility. Click the image to enlarge it.